The Towns contractor,   Coastal Excavation Corporation, will be continuing construction of a new stormwater drainage system along River Road near Rosa Lane.  This project represents the seventh project constructed in an effort to improve water quality in the Three Bays Watershed.  Lane closures will be necessary to perform work within the right of way along River Road and within sections of the roadway.  Police details will be on site to direct traffic around the lane closure.  Construction activities are on-going and anticipated to last two months.  Weather pending, construction will be on-going, Monday through Friday from 7:00 AM to 5:00 PM until completion of the project.  Drivers are advised to slow down and use extreme caution when traveling through or near construction areas.  Please follow all posted safety signs and look twice for bikers and pedestrians.