
Road Closure on Bumps River Road, Osterville
Starting as early as Monday, November 9, 2026, a contractor working for the Town of Barnstable, Robert B. Our Co. Inc., will resume sewer construction within a portion of Bumps River Road, Osterville, as part of the Route 28 West Sewer Expansion Project.
Here’s What Residents and Motorists Should Know:
- Location: Bumps River Road, Osterville, from Osterville-West Barnstable Road to Pond Street (as shown in the accompanying figure)
- Hours: 7:00 AM to 5:00 PM, Monday through Friday, weather permitting
Impact: Localized road closure, no thru traffic permitted
Throughout construction, detour signage will be in place and local residential, business, and emergency access will be maintained. Traffic control personnel will be onsite to assist motorists.
Work on Bumps River Road is anticipated to be completed by the end of December.
For construction updates and related project materials, please visit the Barnstable Water Resources project webpage, here: BarnstableWaterResources.com/28West
If you have any questions or wish to receive project updates, please contact Christopher Gadd, Communications Assistant, at the Department of Public Works at 508-790-6400 or Christopher.Gadd@Barnstable.gov

