The Town of Barnstable’s contractor, C.C. Construction, Inc., is scheduled to resume installation of sewer along Shootflying Hill Road, as identified within the Centerville Village Sewer Expansion Project-North Phase.
As a result, Shootflying Hill Road will be closed to thru traffic from Great Marsh Road to Service Road during construction hours, Monday through Friday from 7:00 AM to 4:00 PM.
Throughout active construction, access to businesses and residences will be maintained. Dependent on the location of the active work zone, it may be necessary to access properties along Shootflying Hill Road from alternate directions. Traffic control personnel will be onsite to assist motorists. Outside of active construction hours, the road will be open to all traffic.
To view real-time road closures and detours associated with this work, please visit the Waze Live Map located at: https://www.waze.com/live-map.
As always, please slow down and use extreme caution when traveling through the road construction areas and follow posted safety and detour signs. Even after roads are reopened, surfaces may be temporarily uneven or unfinished until work is complete.
If you have any questions or wish to receive project updates, please contact Kelly Collopy, Communications Manager at the Department of Public Works, at 508-790-6400 or Kelly.Collopy@town.barnstable.ma.us

