Starting on Monday, May 22, 2023 contractor Robert B. Our installing a new water fire suppression line along Main Street, Hyannis. Active construction will take place between Old Colony Road and Pleasant Street. Weather pending, construction will be on-going from 7:00 AM to 4:30 PM. Localized traffic will be reduced to a single lane, alternating. Traffic control will be onsite to direct motorists as needed. As always, please slow down and use extreme caution when traveling through the road construction areas, and follow posted safety and traffic signs.
(Figure: Fire Service Installation – Week of 5.22.23)