On October 8,9 and 11, 2024, a contractor for the Town of Barnstable will be conducting an as built survey along the following roads: Craigville Beach Road from Covell’s Beach to Strawberry Hill Road, Strawberry Hill Road, Wequaquet Lane, and Phinney’s Lane from Wequaquet Lane to Iyannough Road.

 

Work will occur between the hours of 7:30AM and 3:30PM. During this time, temporary one-lane alternating traffic flow will be in effect as the crew progresses along the route. Barnstable Police Department will be providing traffic control to direct motorists.

 

As always, please slow down and use extreme caution when traveling through the road construction areas and follow posted safety and detour signs.