Starting Monday May 15th, 2023, contractors Ryko along with Lawrence Lynch will be replacing a section of curbing and repaving sidewalk within the vicinity of 556 Yarmouth Road, Hyannis.  Weather pending, construction will be on-going from 7:00 AM to 4:30 PM. Traffic will be limited to alternating, one-lane vehicular traffic. Traffic control will be onsite to direct motorists as needed. As always, please slow down and use extreme caution when traveling through the road construction areas, and follow posted safety and traffic signs.